Case Study VVIP Penthouse


Location:

Al Maryah Island, Rosewood Hotel Building (mixed use hotel + residential), Abu Dhabi, UAE

Built-up Area

1,200 m2
12,916 ft2

Project Cost

AED 30M

Delivery Method

Design-build

Project Status

Completed

Project Overview

We led and managed the full design process with the client, designer, and consultant, ensuring seamless coordination between all project trades. Our scope included managing the engineering team from shop-drawing production and material approvals through to execution and handover, as well as overseeing the ID fit-out contractor and the procurement of the complete FF&E and OS&E packages.

The penthouse was located within a fully occupied mixed-use residential–hotel tower, introducing strict logistical and operational constraints. This required meticulous planning, close coordination with building/hotel management, and disciplined sequencing of construction activities to ensure smooth progress with minimal disruption.